← Evidence & methodology

Anthropic AI Office

1.0.0-rc.1 · Evidence cutoff 12 September 2026

Directly documented interface

Code participation

Administrator confirms signature for specified voluntary code chapters; not regulatory compliance.

signatory → administrator. signatory → administrator

Displayed claim → analysis (if present) → coded attributes → interface / instrument → atomic evidence → source version

Instrument and timeline

Instrument
Code participation
Bindingness
Voluntary code; underlying statutory obligations are separate
Announced
Unknown
Observed by
2026-07-31 · register-version
Effective period
UnknownUnknown
Event
Listed in dated register
Status at cutoff
unresolved/unknown
Last confirmation
2026-07-31

No material conflict recorded; no absence of conflict inferred.

Status investigation

Checked 2026-09-12; assessed as of 2026-09-12. Last confirmation does not establish uninterrupted continuity.

amendments
unknown
expiry
unknown
termination
investigated within listed sources
restrictions
investigated within listed sources
succession
see succession.json
conflicts
No material conflict recorded; no absence of conflict inferred.
Search queries
  • "anthropic" "eu-ai-office" code participation 2026 amendment termination expiry status before:2026-09-13

Analytical assessment

No reviewed analytical conclusion is attached. This does not establish independence or absence of an institutional constraint.

Coded attributes

technical-control: shared-constrained

Practical ability to alter the model, its availability, or safeguards in the specified deployment. Contract clauses alone are insufficient.

Actor × exact model/deployment × period. Anthropic provision and replacement of Claude models for DoW, contrasted with deployed operational control; 2025–August 2026; assessed 2026-08-27.

Anthropic provides model artifacts and responds to feedback; DoW and cloud providers independently gate operational deployment. Existing deployed models are outside Anthropic technical alteration or shutdown. Consequential functions are divided across institutions, satisfying shared/constrained control without attributing a real-time veto.

Supporting evidence: court-model-provision court-update-gate . Counterevidence: contractual-control court-static-deployment

  • Coding applies only to stated context and date, not a permanent institutional rank.
Published rubric anchors
little-control
No demonstrated practical control over the specified consequential operation, with affirmative contrary evidence.
shared-constrained
Consequential controls divided among actor, host, customer or enforceable technical constraints.
substantial
Actor demonstrably retains major development, update or access controls in this environment.
dominant-lifecycle
Actor demonstrably controls development, deployment, updates and access across the specified lifecycle without a consequential independent controller.

Unresolved when necessary evidence is missing or adjacent anchors cannot be distinguished. No numeric conversion. Absence requires affirmative remit or operational evidence, not missing sources.

Atomic evidence and exact sources

Anthropic could not technologically enforce contractual usage restrictions and lacked direct visibility into DoW use.

Source
Anthropic v DoW: summary judgment, document 250 · US District Court, Northern District of California
Version
2026-08-27; retrieved 2026-09-12
Exact locator
Printed page 6
Limit
Specific deployed environment; does not imply no control over future development, contracts or provision.

Byte capture unavailable. HTTP Error 403: Forbidden Published document identity and locator remain recorded.

The Commission lists anthropic as a code signatory.

Source
GPAI Code: confirmed signatory register · European Commission
Version
2026-07-31; retrieved 2026-09-12
Exact locator
Signatories section
Limit
Register version 31 July 2026; signature date unknown. Participation is not a compliance judgment or universal model coverage.

Retrieved bytes SHA-256: ecbe67a98d506cc30b7c839c7affb0d153ea58e1d411cc6b1c92449fa8dc0592

The court describes deployed DoW Claude models as static and beyond Anthropic technological access, alteration or shutdown.

Source
Anthropic v DoW: summary judgment, document 250 · US District Court, Northern District of California
Version
2026-08-27; retrieved 2026-09-12
Exact locator
Printed page 17, Section II.F, first paragraph
Limit
Applies to deployed models described in this litigation, not future model provision or hosted consumer services.

Byte capture unavailable. HTTP Error 403: Forbidden Published document identity and locator remain recorded.

The court records that replacement Claude models undergo third-party cloud-provider and DoW security testing and evaluation before operational approval.

Source
Anthropic v DoW: summary judgment, document 250 · US District Court, Northern District of California
Version
2026-08-27; retrieved 2026-09-12
Exact locator
Printed page 17, Section II.F, first paragraph
Limit
Identifies a deployment approval gate, not complete interpretability, universal evaluation sufficiency or provider substitutability.

Byte capture unavailable. HTTP Error 403: Forbidden Published document identity and locator remain recorded.

The court records Anthropic providing models to DoW or a primary defense contractor and responding to DoW evaluation feedback and requests.

Source
Anthropic v DoW: summary judgment, document 250 · US District Court, Northern District of California
Version
2026-08-27; retrieved 2026-09-12
Exact locator
Printed page 17, Section II.F, first paragraph
Limit
Provision is distinct from control over deployed inference; future supply terms and update alternatives are unspecified.

Byte capture unavailable. HTTP Error 403: Forbidden Published document identity and locator remain recorded.

Supporting and conflicting evidence

Interface support: e-anthropic-eu-code. Counterevidence: None recorded; this does not mean none exists.

Substantive review

evidence/contractual-control: approved · agent reviewer codex-research-checker · 2026-09-12

Judgment page6 distinguishes contractual conditions from technical enforcement and use visibility in the specified environment; later provision and lifecycle control are expressly not excluded. Checked locator: Printed page 6. Source version: 2026-08-27.

Approval fingerprint: 1e7930e6d70cddee066b09a959f5046c89228cfdbf91ecb37db5b43d6212271a

evidence/e-anthropic-eu-code: approved · agent reviewer codex-research-checker · 2026-09-12

Commission signatory registry version July31 explicitly lists anthropic. Unknown signature date, chapter scope and participation-versus-compliance distinction are retained. Checked locator: Signatories section. Source version: 2026-07-31.

Approval fingerprint: 1e7930e6d70cddee066b09a959f5046c89228cfdbf91ecb37db5b43d6212271a

instruments/i-anthropic-eu-code: approved · agent reviewer codex-research-checker · 2026-09-12

Commission registry supports the dated code-participation instrument for anthropic; voluntary code and separate statutory obligations are distinguished.

Approval fingerprint: 1e7930e6d70cddee066b09a959f5046c89228cfdbf91ecb37db5b43d6212271a

relationships/anthropic-eu-code: approved · agent reviewer codex-research-checker · 2026-09-12

Dated Commission registry supports anthropic participation directed to the administrator, not regulatory compliance. Signature/effective dates and uninterrupted September status remain unknown.

Approval fingerprint: 1e7930e6d70cddee066b09a959f5046c89228cfdbf91ecb37db5b43d6212271a

evidence/court-static-deployment: approved · agent reviewer codex-primary · 2026-09-12

Independently inspected the primary source at the recorded locator. Narrow proposition, attribution, date/version and stated limit supported; conflicting access/technical/status accounts remain separate.

Approval fingerprint: 1e7930e6d70cddee066b09a959f5046c89228cfdbf91ecb37db5b43d6212271a

evidence/court-update-gate: approved · agent reviewer codex-primary · 2026-09-12

Independently inspected the primary source at the recorded locator. Narrow proposition, attribution, date/version and stated limit supported; conflicting access/technical/status accounts remain separate.

Approval fingerprint: 1e7930e6d70cddee066b09a959f5046c89228cfdbf91ecb37db5b43d6212271a

evidence/court-model-provision: approved · agent reviewer codex-primary · 2026-09-12

Independently inspected the primary source at the recorded locator. Narrow proposition, attribution, date/version and stated limit supported; conflicting access/technical/status accounts remain separate.

Approval fingerprint: 1e7930e6d70cddee066b09a959f5046c89228cfdbf91ecb37db5b43d6212271a

institution-attributes/dod-claude-control: approved · agent reviewer codex-primary · 2026-09-12

Checked rubric and contextual evidence, including Augustcourt p17, MarchCIO pp27–29 and MaySenate pp59–68. Divided control is not remote veto; meaningful reliance is not structural indispensability; substitution ordinal remains unresolved.

Approval fingerprint: 1e7930e6d70cddee066b09a959f5046c89228cfdbf91ecb37db5b43d6212271a

Release-pinned methodology →